Skip to content
P2

Tailoring

Match the control to the project.

Use tailoring to avoid both too little control and too much paperwork. Start with the recommender, then choose a reporting rhythm and templates.

Lite

A practical control level with matching templates, governance rhythm, reporting cadence, and watch-outs.

Standard

A practical control level with matching templates, governance rhythm, reporting cadence, and watch-outs.

Enhanced

A practical control level with matching templates, governance rhythm, reporting cadence, and watch-outs.

Recovery

A practical control level with matching templates, governance rhythm, reporting cadence, and watch-outs.